Clear Ceiling Height
Showers and tubs with showerheads must have a 30 inch by 30 inch area that has a ceiling height of no less than 6 feet 8 inches at the showerhead.
Clear ceiling height. The difference between ceiling height and clear ceiling height is that the ceiling high as measured from the floor to the underside of the roof and clear ceiling height is measured from the floor to the underside of the lowest hanging object on the ceiling whether that be a light or a sprinkler or a beam. Minimum ceiling height in bathrooms is 6 feet 8 inches. A ceiling with exposed beams spaced at least 4 feet apart can measure 6 feet 6 inches from the floor to the underside of the beams.
This is the most important measure of the interior height of an industrial building because it defines the minimum height of usable space within the structure. The distance from the finished floor to the lowest hanging overhead obstruction clear height is especially important for competition basketball and volleyball as certain sport governing bodies set forth clear height rules for competition play. Habitable basements shall have a minimum clear ceiling height of 7 feet 0 inches except that beams girders and other obstructions spaced not less than 4 feet on center may project not.
The key is to make sure that the diagonal measurement from the front of the top to the back of the bottom does not exceed 8 feet. The latest evolution is a move upward to 36 foot clear buildings particularly in high throughput distribution markets such as southern california and indianapolis. Today s standard ceiling height is nine feet.
Habitable spaces that have a sloped ceiling shall at no point have a ceiling height less than 5 feet and no less than 50 of the floor area shall have a ceiling height less than 7 feet. In one and two family dwellings beams or girders spaced not less than 4 feet 1219 mm on center may project not more than 6 inches 152 mm below the required ceiling height provided that a clear height of 7 feet 2134 mm is maintained. This way you can carry the piece into the house on its side then lay it on its back.
Then simply tip it upright. Height of 7 feet measured to the lowest projection from the ceiling. Distance from the floor to the lowest hanging ceiling member or hanging objects beams joists or truss work descending down into a substantial portion of the industrial work area.
Newer houses are often built with nine foot ceilings on the first floor and sometimes eight foot ceilings on the second story.